Tag Archives: India

Little Nicobar to Sabang

28 January 2011 | Eng hrs: 1889.0 – 1926.0 | 2,400 RPM Painful slog against consistent 1.3kts of current. Engine is groaning every time we smash into 3 waves in a row, bringing our speed through the water down to … Continue reading

Posted in Uncategorized | Tagged , , , , , , , , , , , | Leave a comment

Tillanchang Island to Little Nicobar

27 January 2011 | Eng hrs: 1873.7-1889 | Avg RPM 2,400 | Conditions: Rough seas 3-4m when not in the lee, winds consistently 20-30 kts. Another tough passage day. Some relief when in the lee of Nicobar islands, but getting … Continue reading

Posted in Uncategorized | Tagged , , , | Leave a comment

Port Blair to Tillanchang Island

25 January 2011 | Engine hrs 1869.1 – 1873.7 | 2,300 RPM | Storm – 48 kt winds After sailing for more than 24 hours from Port Blair, gusty conditions with 20 kts wind consistently, we encountered a squall. 36 … Continue reading

Posted in Adam Wible | Tagged , , , , , | Leave a comment

Barren Island to Laccam Harbour

15 Jan 2011 | Start: 1220, Finish: 2323 | Eng hrs: 1859.0 – 1861.3 | Avg RPM: 2,400 | Conditions: About 1m seas, 10-15 kts wind consistent from NE, sunny Woke up at 6:30, waiting for 9:30 so the light … Continue reading

Posted in Uncategorized | Tagged , , , , , , | Leave a comment

Laccam Harbour to Barren Island

14 Jan 2011 | Start: 0330, finish: 1315 | Eng hrs: 1851.3 – 1859.0 | Avg RPM: 2,400 | Conditions: Overcast in the morning, then sunny for the day. 1-2m swell with consistent 15-18kts wind on the nose Woke up, … Continue reading

Posted in Uncategorized | Tagged , , , , , , , | Leave a comment

Long Island to Havelock #1 via Baratang

13 Jan 2011 | Start: 0830, finish: 1730 | Eng hrs: 1844.0 – 1851.3 | Avg RPM: 2,400 | Conditions: Calm, sunny, 1m swell once we reached open water Started at low tide to reach mouth of Homfray Strait with … Continue reading

Posted in Uncategorized | Tagged , , , , , , | Leave a comment

Lazy Day at Long Island

12 Jan 2011 | Conditions: Calm and sunny Slowed down, put off circumnavigation of Baratang for tomorrow morning. Took dinghy down and went ashore near where the new jetty was being constructed, with iron and concrete pylons being hand-poured. Same … Continue reading

Posted in Uncategorized | Tagged , , , , , , , | Leave a comment

Port Blair to Long Island

11 Jan 2011 | Start: 0800, finish 1600 | Eng hrs: 1835.8 – 1844.0 | Avg RPM: 2,500 | Conditions: Flat, glassy seas, minimal wind from strange angles, heavy clouds on the horizon Uneventful departure from Port Blair. Seized the … Continue reading

Posted in Uncategorized | Tagged , , , , , , , | Leave a comment

Rutland South Bay to Port Blair

Motor sailed, partially to reach Port Blair sooner, and partially to charge the batteries which had somehow fallen to 12.3V. Swell large and confused coming around the point at Rutland, but moderated once we reached deeper water. Continue reading

Posted in Uncategorized | Tagged , , , , , , , | Leave a comment

Fishing and snorkeling at Neill Island

02 Jan 2011 – remain at Neil Island. Eng hours: 1825.5. Beautiful sunny weather, no swell in the lee of Neil. Relaxed day at Neill Island, nice beach with stone arches, but pretty brutal walk/swim across shallow, drying, jagged coral … Continue reading

Posted in Uncategorized | Tagged , , , , , , | Leave a comment